Kenchikuya logo Kenchikuya Professional Build
⌁   KENCHIKUYA / TOOLS

Crown, meet ceiling.

Compound cuts for corners, rakes & the transitions between.

01 / DEFINE THE JOINT

Signed from level, following A → joint → B. Positive rises; negative falls. A peak uses A positive and B negative. Measure the molding run, not roof pitch.

Mirror reverses travel: A/B exchange and inclinations change sign. Inside/outside remains the same.

02 / INSTALLED VIEW

MEASURE & ORIENT

Spring angle S

SCeiling edgeWall edgeWall

Angle from the wall to the straight crown back reference line, in a section square to the run. 52/38 crown normally uses 38° from wall. Use the actual installed spring; both pieces use the same spring. The level ceiling line here is a reference illustration; vaulted ceiling contact is a separate check.

Run inclination

inclinationLevel 0°Actual molding run ↗

Use a digital level along the run. A ceiling slope only equals this angle when the run follows that slope. All supported walls are vertical; twisted stock and differing profiles are outside this version.

Flat on the saw

FENCE / ceiling edgeFACE UPWall edge / operatorLEFTRIGHT

Seat the back reference plane flat; decorative face up. Ceiling edge at the fence, wall edge toward you. Directions are viewed from the operator: miter describes the blade's front moving left/right; bevel describes its top tilting left/right. Use a dual-bevel saw for these placements.

Geometry, limits & reference checks

Identical profiles and sizes, equal installed spring, vertical walls and no roll about the run. A 3D frame models each piece. A reflection across the joint plane must align both profile axes before settings are shown. Horizontal formulas are not reused for rakes.

A corner angle is the smaller angle between wall traces in plan. For outside corners enter 90°, for example, rather than the reflex 270°. A slope change on one wall is defined by both run inclinations; the elevation included angle is 180° minus their difference.

The two-joint transition uses a level intermediate piece on B's wall. End cuts do not establish its length or verify contact with a sloping ceiling. Lay out the stock width, profile, shoulder clearance and transition size on site; back-edge relief or a different detail may be necessary. Arbitrary rolled crown, nonvertical walls and different springs require more measurements and are unsupported.

Reference: 38° spring / 90° horizontal corner → 31.62° miter, 33.86° bevel. Milwaukee saw manual · Gary Katz on cathedral transitions